What should I confirm before production and delivery?

FAQs
3D concept illustration: an assembled aluminum unit resting in a custom fitted clean foam tray with its protective cover nearby

Release production against an agreed specification rather than an informal collection of files. Confirm both the technical configuration and the scope of delivery before the order proceeds.

Freeze the controlled information

Record the approved model and drawing revisions, quantity, material grade and condition, manufacturing route and finish. For an assembly, confirm the BOM, hardware specifications and the items supplied by each party. Identify any approved alternatives or remaining decisions explicitly.

Confirm inspection and release conditions

Agree which sample or first-article checks are needed, what the acceptance criteria are and who approves the result. State any material records, dimensional reports or application-specific tests required with the order. An appearance sample and a dimensional report address different acceptance questions.

Define delivery and changes

Confirm protective packing, part identification, delivery location and the requested schedule in the commercial agreement. A later revision can affect programming, tooling, material, samples and timing. Review changes before work proceeds; a previous approval does not automatically cover a modified configuration.

Related guidance

Contact Details

Tell us about your part. Our team will review your requirements and prepare a quotation.

STEP / STP, IGES / IGS, STL, OBJ, 3MF, DXF, DWG, PDF or ZIP.

Up to 5 files · 100 MB per file · 300 MB total

Loading file upload…

    Please review our Privacy & Project Data and File Confidentiality guidance before sharing restricted files.

    Discuss NDA requirements before sharing sensitive files. Fields marked * are required.

    Ready To Start Your Project?

    Start With Your Drawings - or Tell Us What You Need

    Share drawings, photos or sketches with your quantity, material, finish and target date. We review the available information, clarify technical requirements and confirm quotation timing.

    Discuss confidentiality and NDA requirements before sharing sensitive project files.

    Scroll to Top